Generator Install + 100A ATS — Ironwood Apartments
Ironwood Apartments · Warehouse
$20,033
Generator Install
Scope of work
Install standby generator with automatic transfer switch. Customer to provide site access during working hours.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material4/0 AWG Aluminum SER Cable | 101 ft | $8.22 | $830.22 |
| Material20A Double-Pole Breaker | 3 ea | $36.97 | $110.91 |
| Material200A Main Breaker Load Center, 40-space | 6 ea | $609.04 | $3,654.24 |
| Material6 AWG Bare Copper Ground | 274 ft | $2.92 | $800.08 |
| Material10 AWG THHN Copper, Red — 500 ft spool | 2 spool | $305.45 | $610.90 |
| Material12 AWG THHN Copper, White — 500 ft spool | 3 spool | $200.81 | $602.43 |
| PermitPermit and inspection fees | 1 ea | $399.21 | $399.21 |
| LaborElectrical labour — generator install | 110.4 hr | $117.98 | $13,025.25 |
| Total | $20,033.24 | ||
Job photos
2 from the field · click to enlarge
Activity
Notes on this job
- JAJunia AldermanApr 13
Inspection passed first time.
- EVEmmett VanceApr 10
Materials staged at the shop, ready for Monday.
- AssistantMar 27
Estimate drafted from the site notes and sent for review.
Customer
Ironwood Apartments
Emmett Dunmore
Board President
140 Silverbrook Path
Oldsmar, FL 34542
Oldsmar, FL 34542
Assigned crew
Crew 4 — Power & Standby
Timeline
- Lead createdMar 25, 2025
- WonApr 5, 2025
- ScheduledApr 8, 2025
- CompletedApr 10, 2025