Scope of work

Set generator pad, run gas and electrical, commission unit. All work per NEC and local amendments.

Line items

Materials, labor, and fees

DescriptionQtyUnitAmount
Material20A Single-Pole Breaker1 ea$16.25$16.25
Material20A Double-Pole Breaker4 ea$36.97$147.88
MaterialAutomatic Transfer Switch, 200A4 ea$1,553.66$6,214.64
Material400A Meter Main Combo, 42-space2 ea$1,721.36$3,442.72
PermitPermit and inspection fees1 ea$422.36$422.36
LaborElectrical labour — generator install101.1 hr$117.99$11,928.70
Total$22,172.55

Customer

Open
Heron Cove Condominium Association
Desmond Jessup
Board President
3828 Osprey Landing Blvd
Seminole, FL 34557

Timeline

  1. Lead created
    Aug 23, 2022
  2. Bid lost
    Sep 7, 2022

Lost: Project cancelled by owner